On March 31, 2006, a Notice of Violation was issued for a Severity Level III violation involving the failure to comply with the written procedures required by the facility's Technical Specifications addressing entry into high radiation areas (HRAs). Specifically, a contractor pipefitter foreman and two contractor pipefitters entered a properly posted HRA without reviewing and signing the appropriate radiation work permit and without a briefing from radiation protection personnel for entry into a HRA.